Maricopa Site Photos
Steel roof deck is in place along with fire sprinkler rough in

Old weigh station and office have been demolished

Entry drive storm drainage infrastructure

The 4' high area above the ground has been stripped showing the different bands of color

Transformer pad location near Central Plant

Aerial photo 8

Aerial photo 5

Aerial photo 1

Underground plumbing at Bldg C - now backfilled

Rammed earth form work for the end walls at Bldg B

First load of steel beams for Bldg C

Storm water system

Chilled water supply

Bldg B stem wall being formed

Putting in underground plumbing

Foundation work

Chilled water supply and return lines being run from the Central Plant

Structural steel work continues, steel roof has been landed to the lower roof

Rammed earth wall has been covered with plywood for protection from ongoing construction

Form work being placed for drive curb and gutter

Rammed earth walls being formed and compacted

Chilled water supply and return lines at the Central Plant

Aerial photo 7

Aerial photo 3

Column footings for Bldg B

Chemical dilution tank at Bldg C

Rammed earth mock-ups. Sample on right has been approved

Storm water system being placed and back-filled

Chilled water supply and return piping from the Central Plant to other buildings

Chemical dilution tank for the chem waste system which serves the Lab Classrooms at Bldg B

Bldg B Stem Wall is being formed where the rammed-earth end wall will be constructed

Underground plumbing

Foundation work in progress

Work on concrete curbs and gutters continues for roadways and parking areas

Rebar being placed over yellow water proof membrane

Dry wells being drilled in retention area

Storm drainage system

Aerial photo 9

Aerial photo 6

Aerial photo 2

Fire line for Bldg C

Rebar for the end walls at Bldg B

Sewer pipe, water pipe, column anchor bolts mounted on templates

Storm water system being placed

Chilled water supply and return piping

Conduit is being placed for the Bldg B transformer and switch

Communications conduit being routed into the IDF Room Bldg C

Sanitary sewer line for Bldg C

Return lines being run from the Central Plant